March/April 2017 - Some of our Activities on site




12 March - A cast iron water pipe developed a leak. Here a temporary repair is made pending a permanent solution is implemented.
(Photo courtesy Brian Haigh)




12 March - Peckett 'Pectin'. The overhaul continues. Here an extension to the buffer can be seen. The result should be a smoother journey as the buffer will be in contact with the next vehicle rather than a gap being present.
(Photo courtesy Brian Haigh)




12 March - Overhaul of the SR brakevan - still in demolition and cleaning stage! Here the internal brake column has been removed. A heavy piece of kit!
(Photo courtesy Brian Haigh)




(Photo courtesy Brian Haigh)




2 April -Ducket on side of brakevan (enabling guard to see forward in safety) has had a new piece of metal welded in (almost invisibly towards the bottom).
(Photo courtesy Brian Haigh)




2 April
(Photo courtesy Brian Haigh)




19 March
(Photo courtesy John Rees)




12 March - Replacement of the tubes in steam engine 'Lord Fisher' has been necessary together with some other work. A new tube is being 'swelled' to help make a tight fit in the tubeplate. Once fitted the inside will be rolled to produce a perfect match.
(Photo courtesy Brian Haigh)




Being cooled slowly to avoid the metal becoming brittle.
(Photo courtesy Brian Haigh)




Showing front tube plate with tubes removed.
(Photo courtesy John Rees)




Announcements will be made when 'Lord Fisher' is fit to resume service.
(Photo courtesy John Rees)




4 April
(Photo courtesy Brian Haigh)




Cutting tubes to length.
(Photo courtesy Brian Haigh)




Majority of tubes now in place. To be rolled to complete a watertight seal on the tubeplate.




23 April- Refitting the dome.
(Photo courtesy Brian Haigh)




Carrying out a hydraulic pressure test on the boiler, fittings and tubes to check that everything is watertight and safe.
(Photo courtesy Brian Haigh)




27 April - showing the new tubes fitted.
(Photo courtesy Brian Haigh)




Turntable renovation restarts!
(Photo courtesy Brian Haigh)




2 April - Ruston on duty today.
(Photo courtesy Brian Haigh)




Miniature Railway. Lovely little engine!
(Photo courtesy Brian Haigh)




(Photo courtesy Brian Haigh)




4 April - Both diesels receiving some TLC
(Photo courtesy Brian Haigh)




27 April
The two Fowler locos.(Photo courtesy Brian Haigh)




27 April - The Ruston now has a blown head gasket! This requires some dismantling of the engine head and the opportunity will be taken to have the injectors checked and overhauled as necessary.
(Photo courtesy Brian Haigh)




Toy train in place and being tested!
(Photo courtesy Brian Haigh)




A section of broad gauge rail has been recovered. Obviously used as a fence post with wire still attached.




Boarding out of new Model Railway room has been completed. Ceiling paint being applied.




Wild animals spotted! Will they be released for Easter? Come along and see where they are hidden!




18 April - overhaul of the buffers on the newly refurbished open wagon. Totally seized!
(Photo courtesy Brian Haigh)




25 April - answer is to set a small fire and, when hot, gently tap the sides and top. Everything now works as it should.
(Photo courtesy Brian Haigh)