Some photos of work and events during January to March 2025. Despite not operating during the early part of the year, much else is happening. |
2 February 2025 James gets stuck into digging a bed/crib in preparation to chage a rotted wooden sleeper. (Photo courtesy Brian Haigh) |
9 February 2025 Steve & Neil continuing the good work. 'Twas a bit nippy round the ears! |
2 February 2025 Always work to do on Peckett 'Pectin'. |
9 February 2025 Each winter, an inspection is carried out on the various safety parts of the engine by a boiler inspector. Here some preventative work has been carried out to clean the front tubeplate of scale build up and then paint to extend its life. |
11 February 2025 The ashpan is being reinstated after the firebox was inspected. (Photo courtesy Brian Haigh) |
2 February 2025 Tidying by the gardening team. (Photo courtesy Brian Haigh) |
9 February 2025 Replacement fence pailings being treated, prior to painting. |
11 February 2025 Work underway to make the area around the Chard Junction signalling panel and displays resemble a signalbox. (Photo courtesy Brian Haigh) |
BACK |