02 March 2008
Permanent fitting of the refurbished coupling rods was undertaken and the chassis was taken for a spin to ensure everything was well with the rods and gearbox.




Brian, Dave and Bill attend to the rods.




Work complete.




The Ruston takes the chassis on a test. The next step is to get some of the brake rodding re-connected and then the engine can be put back following overhaul. Although the cab has also been repaired there is still plenty to do before the engine can join its heavier brother in service.


BACK